Work completed.

23/11/2015

The shell plate is continuing to fit perfectly making the job a welders dream.



19/11/2015

Our CB45 Yacht repair, is going well all the internal structure has been repaired and signed off by Tim from Mecal, the repairs went really well.

We have now cut all the repair shell plate from new material the same grade as the original used. Jim Moore who was on the original design team has supplied us with the original cutting files enabling us to cut all the shell plate in house on our plasma table and have quality and file control.

Today the first shell plate has been tacked in place, it fits perfectly which is a show of our collaborative talented and knowledgeable approach to this repair. We will continue to tack all the plates in place ready for welding.




 15/10/2015

All damaged main frames replaced from original cutting files and fully welded together with longitudinal structure ready for plating.